The Architecture
of Moving Image
Hover each frame.
Still photography becomes living cinema.





The House
on the Cliff
A private residence cantilevered over coastal rock. Filmed over four tidal cycles — dawn, noon, dusk, and the hour after midnight.

Cliff House · Malibu
2024 · AIA Award Submission

Interior Study
Handheld · Natural light
The Tower
Before Dawn
A 62-floor mixed-use tower documented across its construction sequence — from concrete core to curtain wall. Shot on Alexa 35.
Meridian Tower · Chicago
2025 · Skidmore, Owings & Merrill · Competition Entry

Aerial Survey
62
Floors documented
847
Hours of raw footage
The full construction sequence — compressed into 18 minutes of cinema.

Atrium · Macro
Structures
Not Yet Built
Competition entries and speculative proposals — the architecture that exists only in light and shadow, waiting for the right client.

Vertical Garden Tower
Seoul · Unbuilt · 2025
Gorge Bridge · Competition Entry
Finalist · World Architecture Festival 2025

Cultural Pavilion
Every speculative project is filmed as though it already exists — natural light, real shadows, the weight of built material.
Speculative cinema










Full portfolio launches
Spring 2026
Early list gets first access and director's commentary — the thinking behind each shot, each cut, each held breath before the frame.